NSC - National Sports Center



At the National Sports Center in Blaine, we have completed many projects through out the campus. General Contracting projects as basic as removing an existing grass field, exporting all material, and importing the necessary stone, installing the drainage system and replaced it with an Artificial Turf; to, soil correcting a 262,800 sf, foot print, exporting 30,000 yards of material, placing fabric, importing 35,000 yds of sand and building a large multiuse Artificial Turf playing surface, complete with fencing, netting, concrete walks and patio areas and lighting.
To date we have completed 17 fields on the NSC campus.
Dimke Excavating also performed the excavation for a new 25,000 sf shop facility at the NSC. This involved a large soil correction reaching 23’ deep and importing material to achieve proposed elevations.
Then excavating footings, backfilling and grading for the new floor, parking lot and sidewalks.
After completion of the new facility, we demolished and disposed of the old shop facility.