NSC-Field 25-32 Renovation

NSC-Field 25-32 Renovation

Installation and ongoing management of required site-specific storm water management protections throughout the life of the project. Removal of existing grass field surfaces. Scraping of existing material to optimal subgrade.

Installation of geotextile fabric, updated field drainage flat tile and collector for optimal water management. Import of aggregate base and trap rock with final grading performed by both GPS and total station guided precision grading equipment. All surfaces prepared and checked to be within acceptable tolerances for field turf installation. Fencing, field lighting, electrical and turf contractors reporting to Dimke Excavating at sub-contractors. 