
SOIL CORRECTION - This was excavating the impacted soils and removing debris dumped in the wetland.

WETLAND CONSTRUCTION - Excavating soil and debris while using GPS to confirm impacted soils were removed to the surveyed depths.

FILTRATION & INFILTRATION BASIN - This was excavating the impacted soils and removing debris dumped in the wetland.

WETLAND CONSTRUCTION - Excavating soil and debris while using GPS to confirm impacted soils were removed to the surveyed depths.
Moody Lake
Moody Lake was a project consisting of three separate projects that took place around Moody Lake. Two of the projects were removing phosphorus rich soils from prior farming operations at the sites. These soils contribute to algae production in local lakes and impacted water quality.
At the third project site we constructed two rain filtration basins to catch run off water from impervious surfaces before they flowed into the lake.