
STORMWATER BASIN - Excavation of the basin and soil stabilization.

STORMWATER BASIN - Seeding and restoration to ensure full vegetation establishment to disturbed area

STORMWATER BASIN - Construction of the basin & Road grading.
Big Marine Lake
Dimke constructed a sediment control basin to catch run off flowing toward the lake that previously had flowed directly into the lake.
We reconstructed and regraded the gravel road to direct water into the basin rather than flowing into the lake.